Licking River Greenway & Trails
Licking River Greenway and Trails (LRGT) is the City of Covington's section of a multi-phase urban trail along the Licking River. The official parks page describes an interconnected corridor meant to connect Covington, Taylor Mill, Wilder and Newport. Official access in Covington includes the area behind Holmes High School at Levassor and Eastern Avenue.
At a glance
| Access (official parks page) | Behind Holmes High School at Levassor and Eastern Avenue; also the dead end of E. 16th Street, Clayton-Meyer Park, and behind Randolph Park |
|---|---|
| Managed by | City of Covington (corridor partners in other cities) |
| Covington trail (official parks page) | About 1.5 miles of nature trail, 0.75 miles of paved trails, and about 2.5 miles of trail using sidewalk and road infrastructure |
| At completion (official parks page) | The multi-purpose trail system will span 12-14 miles |
| Features listed by the city | Trails; art/sculpture (17 murals on levee gatewells) |
About the greenway
The City of Covington Licking River Greenway Trails page calls LRGT an ambitious, multi-phase project to build an interconnected urban trail through the Licking River corridor, connecting Covington, Taylor Mill, Wilder and Newport, Kentucky. In its completion, the city says, the multi-purpose trail system will span 12-14 miles.
The city's Trails page describes Licking River Greenway & Trails as a 2½-mile-long hiking trail along the Licking River from Levassor Place to Randolph Park, with a parallel paved trail running part of the way. That 2½-mile figure matches the parks page's description of Covington's trail when sidewalk and road infrastructure are included.
Covington's trail, according to the official parks page, includes 1.5 miles of nature trail, 0.75 miles of paved trails, and approximately 2.5 miles of trail utilizing sidewalk and road infrastructure. Official features listed on that page are trails and art/sculpture.
Access points
The official parks page says trail access can be found behind Holmes High School at the corner of Levassor and Eastern Avenue. Additional official access locations are the dead end of E. 16th Street, Clayton-Meyer Park, and behind Randolph Park.
The city's RecDesk facility listing for Licking River Greenway Trail gives the address 2234 Eastern Avenue, Covington, KY 41014, and lists facility hours as 8:00 a.m. to 9:00 p.m. daily. Those hours and that street number come from Covington's RecDesk facility page, not from the parks-page narrative. Confirm current hours and the access point you plan to use before you go, because the parks page emphasizes several trailheads.
The official parks page also offers a Map & Directions control. On the page we used, that control pointed to a map search for Thomas Avenue and Glenway Avenue in Covington, which is in addition to the Levassor and Eastern Avenue access described in the text. Use the official access list and confirm the trailhead that matches your plan.
Murals on the gatewells
The official parks page says a series of 17 murals are featured along the LRGT gatewells — structures built into the river side of the levee to regulate water flow — created through a partnership between ArtWorks and SkywardNKY. The city's Trails page says the murals celebrate the Licking River, its ecosystems, and the people who enjoy its beauty. Covington links to ArtWorks' Licking River murals page for more about each mural. This guide does not reprint mural titles or artwork descriptions from that partner page.
What a 2019 city news release added
A September 17, 2019, City of Covington news release, “Licking Greenway years in making,” describes the ceremonial completion of Phases II and III. Facts from that official release, which is a 2019 snapshot, include:
- The project was proposed by the regional group Vision 2015 in 2005 as part of a plan to link recreational opportunities in Covington, Taylor Mill, Newport and Wilder.
- Official ground-breaking occurred May 5, 2012.
- With the 2019 ribbon-cutting, the off-road section stretched from a trailhead at Eastern Avenue and Levassor Place north to Randolph Park in the city's Eastside.
- Most of that stretch included parallel trails — about 0.75 miles of paved trail atop the levee and about 1.5 miles of a gravel nature trail along the river's edge, matching the lengths still used on the current parks page.
- Other access points named in the 2019 release included Clayton Meyer Park at the end of Thomas Street and Austinburg Park at 15th and Eastern.
- The release says that in 2013-14 the city and Vision 2015 worked with ArtWorks to paint 17 murals on concrete gatewells along the floodwall.
- On May 18, 2018, according to the same official release, a metal pedestrian bridge was installed to carry the paved path over 16th Street at the floodwall cut.
Treat those dates as historical official wording from 2019. Current access language on the parks page is the list behind Holmes High School, the dead end of E. 16th Street, Clayton-Meyer Park, and behind Randolph Park.
Planning a visit
Call Covington Parks & Recreation through the contacts on the official parks page — 20 West Pike Street, Covington, KY 41011, (859) 292-2160, info@covingtonky.gov — to confirm hours, closures and which trailhead to use. Those contacts are for the city, not a trailhead address.
Nearby official destinations on this site include Devou Park, Goebel Park and, across the river in Wilder, Frederick's Landing.
Northern Kentucky farmers markets are listed at nkyfarmersmarkets.com.
Using the trail day to day
Plan to use one of the official Covington access points and follow any posted trail signs. The official Trails page distinguishes a hiking trail from Levassor Place to Randolph Park and a parallel paved trail that runs part of the way, so the surface underfoot is not the same for the entire corridor. Confirm whether you want the nature trail, the paved levee path, or a sidewalk and road segment before you go.
If you are visiting the murals, the city says they are on the gatewells on the river side of the levee. Stay on official paths and follow any posted rules. This guide does not add trail difficulty ratings, lighting details or a complete list of connecting streets beyond what the city publishes.
Recycling
We have not confirmed site-specific recycling containers here. For household recycling, drop-off sites and county programs in Northern Kentucky, see nkyrecycling.com.
What to confirm before you go
Confirm current hours (including whether the RecDesk 8:00 a.m.-9:00 p.m. listing still applies), trail conditions, and the trailhead you intend to use. Ask the city if you need current information about Clayton-Meyer Park, Randolph Park or other access points. The 12-14 mile figure on the parks page is the planned system at completion, not a statement that the full corridor is finished today.
Sources
Facts on this page come from the official sources below. If a detail is not listed here, check the official source or call the managing agency before you go. NKY Parks is not a government website. Check the managing agency before you go, especially for seasons, closures and license rules, which can change.
- City of Covington — Licking River Greenway Trails
- City of Covington — Trails
- City of Covington — “Licking Greenway years in making” (Sept. 17, 2019)
- City of Covington RecDesk — Licking River Greenway Trail facility listing
- ArtWorks — Licking River murals (linked from the city's Trails page)
- nkyweb.com government directory
- nkyfarmersmarkets.com
- nkyrecycling.com